Summary of Project

The Pacific Highway, Lisarow to Ourimbah, is the main north-south link between the F3 Freeway and Gosford, and currently carries around 29,000 vehicles per day from regional and local areas.

The project, funded by the Roads and Maritime Services (RMS), includes widening the highway to provide two lanes in each direction to improve traffic flow and safety. The project includes the following key features: new traffic lights with pedestrian crossing facilities at the Ourimbah Street, Teralba Street and Walmsley Road intersections; a shared pedestrian and cycle path on the western side of the highway; and new bridges over Cut Rock Creek and widening of the highway to two lanes.

The upgrade will improve traffic flow and travel times for around 29,000 motorists travelling this 1.6 kilometre section of highway each day. It will also improve safety for motorists, pedestrians and road users.

Summary of Involvement

Dreise Tucker ATOL Pty Ltd provided the detailed design of temporary traffic staging and pavements for extensive road alignment and a number of signalised intersections. In delivering the detailed engineering our team deployed highway engineering and pavement engineering services.

Why Dreise Tucker ATOL?

Dreise Tucker ATOL was engaged by CMC due to our ability to work collaboratively with construction managers and provide rapid responses to problems unfolding on site in real time. The documentation created by our team allowed the CMC construction team to construct the permanent works with the confidence that once on site, the staging process worked, the construction program was maintained and both work crew and public safety was assured.